Work-to-date

July 17, 2006


Refined Master Plan

Illustrative Rendering

Site Cross Sections

3D Model Views

Meeting notes from public meeting




Rendering

Illustrative Rendering

April 26, 2006
The City and the design team held a third public meeting to review the latest version of the master plan, referred to as the Refined Master Plan. This plan is a further development of the schemes presented in February and incorporates comments from the February meeting and reviews by city staff.

The following items are graphics used during the presentation:

Refined Master Plan

Site Cross Sections

3D Model - Aerial view of development

3D Model - View of Typical Townhouse Block

3D Model - View of new River Street Extension

Presentation in PDF format (10.8 Meg file)

Meeting notes from the public meeting

Meeting notes from the developers meeting




Refined master plan

Refined Master Plan

February 23, 2006
A second Public Stakeholder Meeting was held and there was a great turnout.  Sasaki presented 3 concepts of what the Port of Rochester could be. 

Meeting Minutes

Scheme A
Scheme B
Scheme C

Market Analysis presentation in PDF format (2 Meg file)

Meeting notes from the developers meeting




site photo


December 15, 2005- Public Stakeholder Meeting
Sasaki conducted a Public Meeting at 7:00 pm in the Roger Robach Center.  Although it was a snowy night, there was a great turnout at the meeting.  Below are the meeting minutes and the diagrams that were presented.

Meeting Minutes

Regional Map- Rochester Area
Regional Map- Statewide
Site Study Area
Existing Land Use Diagram
Existing Zoning Diagram
Existing Utilities Diagram
Transportation Diagram
Views and Viewsheds Diagram
Site Constraints Diagram
Site Opportunities Diagram




Dec. work session

December 15, 2005 - City Representatives Meeting
Sasaki kicked off this trip with a work session with the representatives from the City of Rochester at City Hall.


Meeting Minutes





Dec. site visit

November 17, 2005 - Public Stakeholder Meeting
The Sasaki Design Team attended the first work session with the Stakeholders of Charlotte community at the Ferry terminal building. The purpose of the meeting was to get to know the community and to begin the process of direct interaction in the effort of preparing a comprehensive Master Plan.


Meeting Minutes



Site photo

November 17, 2005 - City Representatives Meeting
Sasaki had a kick off meeting with City Representatives at 8:30 am in the Ferry Terminal building. 


Meeting Minutes





City Representatives meeting

Background Material

As a first step in the development of a preliminary concept plan, the Consultant Team will work with City staff to review and summarize all existing relevant plans and studies that relate to the Port of Rochester. Special attention should be paid to the following documents:

Local Waterfront Revitalization Program (LWRP) Policies for the LWRP
Harbor Area and the Port of Rochester

The Renaissance Plan - Campaign 8: Tourism Destination
(Full plan can be viewed at www.cityofrochester.gov )

Charlotte Visioning Workshop Report- Executive Summary

Bruckner Housing Market Study for Port of Rochester- Executive Summary

City Department of Environmental Services
Geotechnical Information and Analysis Report-  Executive Summary

Environmental Impact Statement- Summary

Charlotte / Port Area Parking Study- Scope of Work

Lake Ontario Research Center- Schematic Design

Port Transportation Evaluation/Support Study- Scope of Work

Lake Ontario Research Center-
Schematic Plan

City Division of Environmental Quality Soil Management Plan- Executive Summary

City of Rochester Department of Community Development
Port Site Foundations Study- Scope of Work

Sector 1 (Charlotte) NBN Plan

Habitat Restoration Feasibility Study for the Rochester Harbor (95% Draft) - Alternatives for dealing with seasonal accumulation of algae at Ontario Beach, prepared for the Army Corps of Engineers, September 2005

Market Study - Proposed Hotel, Rochester, NY - Prepared for the City of Rochester Department of Economic Development by Hospitality Consulting Services, April 1999








Home > Work-to-date
01-Aug-2006